Login  |  Register
STATISTICS
  • Active Links: 29
  • Pending Links: 0
  • Todays Links: 2
  • Total Articles: 10
  • Total Categories: 25
  • Sub Categories: 162

Air Max Black Girls

The first step in the project was trending energy data over a period of time and performing pre functional testing, worked performed by Cogent Energy, an energy company hired by the Chancellor Office. As a result of the testing to determine if equipment was performing according to its design intent, Cogent Energy identified deficiencies and recommended remediation measures.

Air Max Black Girls

Air Max Black Girls

Air Max Black Girls

Air Max Black Girls

The recommendations from Cogent Energy involved complex sequences of operations that required programming changes for the air handling mechanical equipment; for example, fan speeds, previously controlled by static pressure, were changed to volume demand control. Air Max Yellow Neon

a 2010 Best Practice Award for the Energy Efficiency Partnership Program with the California State University System. The award was presented at the 10th Annual California Higher Education Sustainability Conference held Air Max Black Girls in July at CSU, Long Beach. The program has resulted in significant energy cost savings for the University.

Air Max Black Girls

working in the building were patient and flexible. I want to thank them for that. addition to the air volume controllers, six plant controllers and six universal network controllers had to have increased programming with more sophistication to serve up web pages. Finally, all of the graphics had to be modified to reflect the changes. The whole process probably took 470 staff hours, estimated Hayden.

Air Max Black Girls

Air Max Black Girls

Air Max Black Girls

best part of the whole project (including all five buildings) is that the University benefits from the energy savings for the life of each building, said Nunn.

Energy provided guidelines, but Dan had to figure it out and do the programing, said Nunn. took untold hours for him to do it. was some final programming needed beyond what Hayden had done, and College of Engineering, Computer Science and Construction Technology student Scott Vanni was able to use the software Hayden provided and, in just a few weeks, had it done.

The energy partnership program with the Chancellor Office started four years ago. The Chancellor Office and the University each provided part of the funding to look at the energy performance of five existing buildings (Tehama, Performing Arts Center, O Yolo and Student Services Center). The project was under the direction of CSU, Chico Chief Engineer/Energy Manager Neil Nunn, and Facilities Control Specialist Dan Hayden.

Air Max Black Girls

SSC and Yolo Hall were in good shape to begin with, so the fact that remediation measures taken by CSU in a record amount of time resulted in tens of thousands of dollars of energy savings is remarkable, said Nunn.

The monitoring based commissioning improvements CSU, Chico made for the LEED Silver Student Services Center (SSC) were deemed the best in both the UC and CSU systems. CSU, Chico also won the same award for Yolo Hall in 2009.

was the final pieces of the puzzle we needed to complete the project, said Hayden. kept everything in house by using the incredible student talent we have on campus. The whole team owes Scott a lot for getting the project completed. of the things that was difficult for Hayden and his co worker Jeff Talerico was that SSC was occupied during the process. re programmed 475 variable air volume controllers, said Hayden, that meant that a lot of people Nike Air Max 95 New Releases

Staff in the Chancellor Office actually submitted an application for CSU, Chico because they felt that the campus had accomplished an outstanding task in terms of using campus resources and engineers, writing the programming and producing significant results in lowering energy use and therefore costs for energy.

The change in fan speed alone cut the energy needed to run the fans in half. The savings, Nunn explained, is not half of the energy, but three quarters. This has resulted in the lowest energy cost per square foot for buildings on campus.

Hayden, formerly a controls technician for Yamas Controls Inc., has had extensive experience in the programming of commercial buildings. Having Hayden, said Nunn, is like having a contractor working for the University. That is one thing, said Nunn that distinguished CSU, Chico work on the project from other universities that had to hire outside contractors.

Air Max Black Girls

California State University, Chico has received Air Max Day

´╗┐Chico Wins Sustainability Award for Energy Monitoring System

Air Max Black Girls

Air Max Ltd Red

Air Max For Women Blue

Air Max In Shorts

Nike Air Max 95 Jcrd

Air Max 95 4th Of July

Air Max 95 2005

Air Max 95 Hyperfuse

Air Max 95 Usa 2015

Nike Hyperadapt Buy
Air Max Force Barkley

Hypervenom Air Jordan
Nike Kobe 10 Elite Rose Gold On Feet
Nike Air Max 95 Ultra Jacquard Orange

Nike Hypervenom Boots
Nike Sneakers Men

Home / Air Max Black Girls